menu

M&I Phase Connected Systems Track - Submission and Evaluation Plan (Revised 11/12/24)

Challenge Resource
brief description

The revisions as of 11/12/24 are the following:

  • Expanded acceptable methods of configuration for Daylight Harvesting Control Strategy and updated the associated test method
  • Clarified the relationship between task-tuned power and luminaire rated power for the Manual Control Strategy and Grid Services Control

This document provides submission instructions and detailed information to L-Prize Prototype Phase competitors for how their Connected System will be evaluated by the L-Prize Team to verify performance and capabilities as part of the judging process. Competitors should use this information in combination with the L-Prize Official Rules to ensure that their submission includes the necessary documentation, equipment, and capabilities for successful evaluation and judging by the U.S. Department of Energy L-Prize Team. 

Please refer to section IV.4 and Appendix D of the Official Rules for a complete list of documentation that should be included in a submission. 

comments