The L-Prize M&I Phase Submission and Evaluation Plans provide submission instructions and detailed information about how entries will be evaluated. The Submission and Evaluation Plan for the Connected Systems Track has recently been revised. Revisions include: 

  • Expanded acceptable methods of configuration for Daylight Harvesting Control Strategy and updated the associated test method
  • Clarified the relationship between task-tuned power and luminaire rated power for the Manual Control Strategy and Grid Services Control

The revised Connected Systems Track Submission and Evaluation Plan can be found here