menu

Submission

introduction
title
For The Kids Energy
short description
FTK Energy will construct a 75 MW solar farm on Smith County School District public land, and hand over to the local electric coop for O&M.
Submission Package
Cover Page (to be made public)
For_The_Kids_Energy_Cover_Sheet_Rev1_.docx
Summary Slide (to be made public)
Summary_Slide_For_The_Kids.pdf
3 Minute Video URL (to be made public)