menu

NASA Centennial Challenges Program

 118,926

NASA's Watts on the Moon Challenge, Phase 1

Support NASA's efforts to explore the solar system. This Challenge seeks solutions to distribute, store and manage power in space.

This challenge is closed

stage:
Phase 1 Winners Announced
prize:
$500,000

This challenge is closed

more
Summary
Winners
Timeline
Updates29
Forum91
Teams3.3K
Resources
FAQ
Registration
Summary

Overview

This is a US competition only. Please review the Team Agreement for complete eligibility requirements.

Challenge Background and Objectives

As NASA works to extend human exploration of the solar system, unprecedented capacity for electrical and thermal energy distribution, management, and storage will be needed to support sustained human presence and the beginning of industrial activity. 

Solar energy is abundant on the lunar surface but extended night hours (350 consecutive hours) and extreme environmental temperature change from daylight to nighttime operation creates complexity for solar power use. Analogous issues arise on Earth, where demand for additional renewable energy generation, including solar, is rising, but additional power management, distribution, and energy storage solutions are needed to address intermittency and resiliency, among other issues. 

In this Challenge, Teams will propose solutions for energy distribution, management, and/or storage that address NASA technology gaps and can progress toward flight readiness and future operation on the lunar surface. Such solutions may also have important synergies with terrestrial energy needs, and this Challenge is expected to help advance similar technologies for terrestrial application and commercialization. 

In general, NASA is seeking to work with innovators across disciplines to find solutions that address a variety of needs on the lunar surface and will be exploring options to transport potential solutions to the Moon for testing, demonstration, and operation in the coming years.


Guidelines

Updated October 20, 2020. See details here.

Please view the Official Challenge Rules in a PDF document here.

Challenge Overview and Technical Goals

Competition Overview

The Watts on the Moon Challenge will offer Teams up to $5 million in prize purses as well as potential opportunities to test their proposed solutions at NASA facilities. The Challenge will have two phases, totaling no more than 36 months.

The Challenge presents a Mission Scenario with three Mission Activities. Teams will choose one or more activities to address by proposing an energy distribution, management, and/or storage solution. Teams are eligible for a prize purse for each Mission Activity that they address, if they meet or exceed a minimum score (see Phase 1 Judging below). For example, in Phase 1, a Team that addresses three Mission Activities and meets or exceeds the minimum score for each will be eligible for three prize purses.

In Phase 1, Teams will submit a concept design for their proposed solution. Teams will have six (6) months to register and submit concept designs. Phase 1 (including judging) will last approximately eight (8) months (see Competition Calendar below).

Prize purses for Phase 1 will total up to $500,000. NASA will award up to three (3) 1st Place prize purses in the amount of $100,000 each to the winning Team in each Mission Activity (a total of $300,000). NASA may also award up to four (4) additional prize purses in the amount of $50,000 each to the next highest scoring Teams in one or more Mission Activities (a total of up to $200,000). Teams must meet or exceed a minimum score in order to be eligible for a prize purse (see Phase 1 Judging below). The Phase 1 prize purse distribution is summarized in the table below. 

Phase 1 Prize Purse Distribution

 

Mission Activity 1

Mission Activity 2

Mission Activity 3

1st Place

$100,000

$100,000

$100,000

Next Highest Scores

Up to four $50,000 prize purses

 

The initiation of Phase 2 is contingent on the emergence of promising submissions in Phase 1 that demonstrate a viable approach to achieving the Challenge goals. In Phase 2, Teams will build and demonstrate their proposed solution. Phase 2 is expected to last approximately 28 months. The rules for Phase 2 will be released prior to the opening of Phase 2.

Prize purses for Phase 2 are expected to total up to $4.5 million. Additional detail about the number of winners and division of prize purses in Phase 2 (including milestone prizes, if offered) will be included in the Phase 2 rules. 

Mission Scenario and Mission Activities

The Mission Scenario and the three associated Mission Activities are based on anticipated mission operations and environmental features of human and robotic exploration of the lunar surface. The characteristics of the Mission Scenario are purposely intended to incentivize a wide variety of innovative technology solutions to the overall objectives of flexible, robust energy distribution, management, and/or storage solutions that will be critical to the well-being and productivity of human crew and fledgling lunar surface industries. 

The three Mission Activities present different needs for power or energy capacity, different distances between a NASA power plant and the site of activity operations where power is needed, and different mobility features, and operational duty cycles. Each Mission Activity specifies distinct operational consumption of electrical and/or thermal energy, but each is open to solutions that involve conversion between one and the other. 

All of the Mission Activities occur in the vacuum of the lunar environment and specifically at a lunar polar region where the availability of sunlight is irregular. In the polar regions, sunlight is highly dependent on latitude and longitude because of the small declination angle of the Moon, as well as variations in the surrounding terrain. When visible, the sun is always near the horizon. Two Mission Activities take place inside a lunar crater that is a permanently shadowed region (PSR). In this PSR, sunlight rarely or ever intrudes; as a result, the environment is permanently cold and acts as a “cold trap” of volatile chemical species, especially ice.1 Teams must assume that a solution will be immersed in the lunar environment as described here and must describe how their solution will survive and operate in that environment.

Although the Mission Activities do not specify a requirement for system mass, Teams should also consider how they would minimize the system mass of their proposed solution. System mass will be an important consideration for transporting any solution to the lunar surface in the future. 

___________________

[1] “Ice” refers specifically to “water-ice” as opposed to other types of ice found in space locations, such as “carbon dioxide ice” found on Mars.

 

Mission Scenario Overview

Water and oxygen are fundamental to exploration and future habitat on the lunar surface. Specifically, collecting and processing of water-ice and oxygen-bearing minerals to produce propellant and other mission consumables is a desirable early capability goal of the Artemis Program. This Mission Scenario describes a set of activities related to harvesting, processing, and purifying water from icy regolith, as well as oxygen production. 

The Mission Scenario is set both inside and on the rim of a lunar crater that is a PSR, in a polar region where the sky is a thermal radiation sink at 4 kelvins (K) (equivalent to -269 °C) to which surfaces radiate heat. Everything inside the lunar crater is entirely surrounded by the same 4K radiative sink, and items touching the lunar surface must also contend with heat conduction into low thermal diffusivity material at low temperatures on the order of 100 K (-173 °C).

The Mission Scenario assumes that a power plant provided by NASA is deployed on the rim of the crater. The power plant only produces electrical power during illuminated periods, which is at least 300 hours in duration at the beginning of any Mission Activity. 

The Mission Scenario has three Mission Activities, each requiring an energy distribution, management, and/or storage solution:

  • Mission Activity #1: Deliver power from the power plant to a mobility platform operating inside the crater. The mobility platform collects and delivers icy regolith to the water extraction plant.
  • Mission Activity #2: Deliver power from the power plant to a water extraction plant operating inside the crater. The water extraction plant extracts and purifies water from the delivered material.
  • Mission Activity #3: Deliver power from the power plant to an oxygen-producing pilot plant operating outside the crater. The oxygen-producing pilot plant extracts oxygen from the delivered material.

Teams are not responsible for generating power, only distributing, managing, and/or storing energy for each activity, per the activity description. Teams are not responsible for the design or implementation of any features of the lunar resource collection and processing assets, such as the mobility platform or plants. In their solutions, Teams may not assume a modification of any of these assets to change the operational power requirements. Teams may make assumptions about electrical or thermal connections between the asset and their solution as a basis for their design. In addition, Teams may use the mobility platform in their energy distribution, management, and/or storage solution in any of the Mission Activities. Teams must assume that the mobility platform is located at the power plant at the beginning of each Mission Activity and must provide the operational power requirements of the mobility platform while it is being used (as described in each Mission Activity).

The Mission Scenario assumes a NASA power plant with the following characteristics:

  • Located outside the crater in a fixed location near the crater rim
  • Unobstructed line of sight to any assets operating inside and outside the crater
  • Provides 10 kW electrical power at 120VDC
  • Complies with the SAE AS5698 power quality specification
  • Provides power only during illuminated periods, which are at least 300 hours in duration
  • The lunar resource collection and processing assets in the crater operate one (1) km or more distant from the power plant while performing their primary tasks

Mission Activity #1: Collecting Regolith

In Mission Activity #1, a mobility platform collects and delivers water-bearing material to a water extraction plant inside the crater. Teams must propose a solution to deliver power from the power plant to the mobility platform. 

Concept of Operations:

The mobility platform is required to collect and deliver water-bearing material for 100 hours and operates one (1) km from the power plant on the crater rim. During the required total of 100 hours of collection, the vehicle may conduct specific electric motor driven tasks, such as excavation, loading, traversing to and from the water plant, and unloading—resulting in variations of power needs over time. The mobility platform is capable of descending into and climbing out of the crater if needed, but this capability is not required to perform the material collection and delivery task. Due to issues related to long-term exposure to the severe cold environment in the crater, Teams must provide continuous thermal protection heating. The total Mission Activity time may not exceed 200 hours.

Operational Power Requirements: 

  • Initial descent of the mobility platform into the crater is required, consisting of a 10-hour trip with a continuous 150 WE load for vehicle mobility. The platform will have an additional 5 WE load for every additional 1 kg of payload added by the solution. During the descent the vehicle requires an additional continuous 50 WTH delivered at 50 °C for thermal protection. If needed for their solution, Teams may assume a thermal interface between an external heat source and the mobility platform that is 10 cm by 10 cm, providing 0.5 W/cm2 flux.
  • Inside the crater, electric power is required in repeated one-hour cycles of ½ hour at 100 WE followed by ½ hour at 200 WE.
  • 50 WTH is required continuously to maintain an operable environment for the mobility platform components.
  • If climbing out of the crater is needed as part of the power delivery solution, the platform can reach the power plant in a 10-hour ascent, requiring continuous 150 WE for vehicle mobility. The platform will have an additional 5 WE load for every additional 1 kg of payload added by the solution. During the ascent the vehicle requires an additional continuous 50 WTH delivered at 50 °C for thermal protection. If needed for their solution, Teams may assume a thermal interface between an external heat source and the mobility platform that is 10 cm by 10 cm, providing 0.5 W/cm2 flux. Return descent requires the same time and power. During any time outside the crater, the platform will require continuous 50 WE to operate, but no thermal protection power.

Mission Activity #2: Water Production Plant

In Mission Activity #2, a water extraction plant operating inside the crater extracts and purifies water from delivered material. Teams must propose a solution to deliver power from the power plant to the water extraction plant. 

Concept of Operations: 

The water production plant operates continuously to produce clean water from ice-bearing regolith delivered by the mobility platform. The stationary plant is located one (1) km from the power plant on the crater rim. The icy regolith is 2% ice mass fraction and 98% dry regolith (the average specific heat of regolith is 1.2 kJ/kg-ºC). The icy regolith is heated from -220 ºC to 200 ºC to fully extract the water. The plant produces 10 kg of water during a 100-hour operating cycle, at the end of which the water is dispensed from the plant for delivery. Supporting a water delivery is not a required part of this activity. Dry regolith at 150 ºC is continuously discarded. Due to issues related to long-term exposure to the severe cold environment in the crater, Teams must provide continuous thermal protection heating. Total mission activity duration is three water deliveries and up to 300 hours. 

Operational Power Requirements: 

  • If the mobility platform is used in the proposed solution, an initial descent of the mobility platform into the crater is required, consisting of a 10-hour trip with a continuous 150 WE load for vehicle mobility. The platform will have an additional 5 Wload for every additional 1 kg of payload added by the solution. During the descent, the vehicle requires an additional continuous 50 WTH delivered at 50 °C for thermal protection. If needed for their solution, Teams may assume a thermal interface between an external heat source and the mobility platform that is 10 cm by 10 cm, providing 0.5 W/cm2 flux.
  • Inside the crater, electric power is required in repeated one-hour cycles of ½ hour at 500 WE followed by ½ hour at 1,000 WE
  • A continuous thermal protection load of 200 WTH delivered at 50 °C is required to maintain an operable environment for the plant components. If needed for their solution, Teams may assume an interface between the heat source and the water production plant that is 20 cm by 20 cm, providing 0.5 W/cm2 flux.
  • If the mobility platform is used in the proposed solution, the platform can reach the power plant in a 10-hour ascent, requiring continuous 150 WE for vehicle mobility. The platform will have an additional 5 Wload for every additional 1 kg of payload added by the solution. During the ascent, the vehicle requires an additional continuous 50 WTH delivered at 50 °C for thermal protection. If needed for their solution, Teams may assume a thermal interface between an external heat source and the mobility platform that is 10 cm by 10 cm, providing 0.5 W/cm2 flux. Return descent requires the same time and power. During any time outside the crater, the platform will require continuous 50 WE to operate, but no thermal protection power.

Mission Activity #3: Oxygen Production

In Activity #3, an oxygen-producing pilot plant outside the crater extracts oxygen from the delivered material. Team must propose a solution to address electrical and thermal energy needs of the oxygen production. 

Concept of Operations: 

Outside the crater, the oxygen-producing pilot plant experiences irregular periods of solar illumination and eclipse over the course of a 709-hour lunar diurnal cycle. The plant location was selected to ensure that the initial illuminated period in each diurnal cycle is 300 hours long. The remaining time is approximately split between 50% illuminated and 50% eclipsed on an irregular schedule, with no eclipsed period longer than 30 hours and all illuminated periods at least 20 hours long. The power plant only operates during illuminated periods. However, to avoid damage from thermal cycling of high temperature components, the oxygen-producing pilot plant must produce oxygen continuously over the full 709-hour diurnal cycle. The oxygen-producing pilot plant, located 100 m from the power plant, extracts oxygen continuously at a rate of 1 kg/hour from dry regolith that is 14% oxygen by mass (average specific heat of regolith is 1.2 kJ/kg-ºC). Oxygen extraction requires heating regolith from 200 ºC to 1,800 ºC. The plant continuously discards regolith mass at 1,100 ºC at a rate proportional to the oxygen production rate. 

Operational Power Requirements:

  • If the mobility platform is used in the proposed solution, initial traversing from the power plant to the oxygen-producing pilot plant requires one hour, 50 WE to operate plus an additional 5 WE for each additional 1 kg of payload added by the Team.
  • During both illuminated and eclipsed periods, the oxygen-producing pilot plant requires 5 kWcontinuously.
  • Because of the large thermal mass produced by the plant, there is no additional thermal protection requirement.
  • If the mobility platform is used in the proposed solution, the platform can traverse the distance between the oxygen plant and the power plant in one hour, requiring 50 WE to operate plus an additional 5 WE for each additional 1 kg of payload added by the Team.

 

Expectations for Phase 2

All Teams awarded a prize purse in Phase 1 will be encouraged to participate in Phase 2 (if Phase 2 is initiated). Phase 2 is expected to be open to any eligible Team, regardless of whether a Team participated Phase 1. 

If Phase 2 is initiated, Teams will build and demonstrate their proposed solutions. Phase 2 submissions are expected to be tested at NASA facilities and/or other designated laboratories to measure and evaluate the following:

  • How well solutions address Operational Power Requirements of the Mission Activities, as described above
  • How solutions are expected to perform in lunar conditions, as described above, using testing in simulated lunar conditions and/or modeling
  • The system mass and efficiency of the solution

In Phase 2, testing results are expected to be used in a scoring methodology to rank Teams. A Judging Panel would then evaluate the results and determine the winner(s). Appendix A includes a tentative framework for the Phase 2 scoring methodology. 

Competition Calendar 

The following is an overview of the expected timeline for Phase 1 of the Challenge. This calendar is subject to change, and any updates will be posted on the Challenge website: https://www.herox.com/WattsOnTheMoonPhase1

A more detailed competition calendar for Phase 2 will be finalized as part of the Phase 2 rules. 

PHASE 1

Expected Date

Description

09/25/2020
  • Phase 1 registration opens
October 2020 – February 2021
  • Webinars to support registered Teams and potential Teams in developing concept design
  • Promotional activities and/or other support (TBD) for registered Teams
January or February 2021
  • Judging Panel Summit (virtual) to brief judges on roles/responsibilities and Challenge rules
03/25/2021
  • Deadline for registration
  • Deadline for Teams to submit Phase 1 Submission (concept designs)

April 2021

 

  • Administrative review of concept designs to verify compliance with rules
  • Judging Panel conducts virtual interviews with Teams
May 2021
  • Judging Panel reviews and scores designs
  • Judging Panel Summit (virtual) to determine Phase 1 winners
05/20/2021
  • Phase 1 winners announced

PHASE 2 (if initiated)

Expected Date

Description

June 2021
  • Phase 2 registration opens
September 2023
  • Phase 2 winners announced

 

Phase 1 Registration, Submissions, and Judging

Registration

All interested Teams must register for the Challenge by March 25, 2021, at 5:00 PM Eastern Daylight Time and meet the eligibility requirements in order to participate in the Challenge. 

For this Challenge, the registration process will be administered by HeroX. Registration will take place through the official Challenge website: https://www.herox.com/WattsOnTheMoon

As part of registration, Teams will submit the following:

  • Team Information: Teams must submit a Curriculum Vitae, bio, and headshot for each Team Member. All Team Information should be uploaded in a single zip file, per the instructions on the Challenge website.
  • Team Agreement and other legal documentation,  as described in the Legal Requirements section below.

Additional details regarding the process for registration will be available on the Challenge website.

Phase 1 Submission 

In Phase 1, Teams are required to submit a concept design and additional materials for evaluation and judging. The elements of the Phase 1 Submission are described in detail below. Teams must submit a Phase 1 Submission by March 25, 2021 at 5:00 PM Eastern Daylight Time. 

Teams may submit multiple Phase 1 submissions. Each submission should address one Mission Activity. If a Team is proposing concept designs for more than one Mission Activity, each concept design should be a separate submission. 

Teams will submit their Phase 1 Submission(s) from the Challenge website. For some submission elements, Teams will fill out a form field with a character limit; for other elements, Teams will upload one or more attachments. The limits for submission elements are summarized in the table below. 

Each Phase 1 Submission should include the following elements:

  • Concept Design Title: This title may be displayed on the competition website post-submission.
  • Technical Abstract: Provide a brief summary description of the solution. The Technical Abstract should be contained in a single paragraph. Focus on delivering a compelling overview so that the Judging Panel members assigned to score your application will want to read more. This is your opportunity to make a strong first impression, so make every word count!
  • Technology Readiness Level (TRL): Technology Readiness Level (TRL) is a measurement system used to assess the maturity of a particular technology. Provide an estimated current technology readiness level for your solution and a description that supports your assessment of the current TRL. NASA is seeking solutions of sufficiently high fidelity that, if and when Teams successfully complete testing at the end of Phase 2 of the Challenge, the technologies would achieve TRL 6, as defined here: https://www.nasa.gov/pdf/458490main_TRL_Definitions.pdf.
  • Technical Approach: Teams must provide a technical description of the proposed solution, including description of the major hardware components of the system; a three-dimensional drawing or similar informational schematic; a quantitative analysis that estimates system behavior including interactions between sub-systems, thermal models addressing interactions with the environment, estimates of overall energetic and exergetic efficiencies, and the mass estimates of sub-systems; concept of operations describing deployment and steady-state operations; and any testing and evaluation data (published or unpublished) that validates the success of the technical approach, if available.
  • Intellectual Property: Teams must explain who owns the intellectual property of the proposed solution. If the solution is built on existing or off-the-shelf technology, Teams should detail the permissions (if applicable) they have to use that technology. If a Team is part of an organization, the submission should indicate where the ownership of the intellectual property resides.
  • Addresses the Mission Scenario and Mission Activities: Teams must describe how their solution(s) will address one or more Mission Activities, as described above. Teams should describe any potential impediments to evaluating their solution in simulated lunar conditions, including the possibility of operational testing in a vacuum chamber that can simulate the lunar thermal environment.
  • Development Plan: Teams must provide a plan for developing their solution to a prototype fidelity in Phase 2. The plan should describe development tasks, the project schedule, key milestones and include an assessment of technical and other development risks as well as the expected approach to managing risks. Teams must provide a budget narrative that describes how the Team will fund technology development and a description of current investors, funding partners, sponsors, suppliers, and formal collaborators connected with the Team.
  • Terrestrial Impact: Teams should describe relevance of their technology to the terrestrial energy sector (if any), such as intersections with distributed energy resources, grid-scale energy storage, grid ancillary services, microgrids, alternative fuel vehicles, innovative energy business models, harsh environments, or other applications.
  • Environmental Sustainability: Teams are encouraged to take in consideration long-term environmental impacts on the Moon, including how to minimize waste, address disposal of hazardous materials, and/or opportunities for recycling. If applicable to their proposed solution, Teams should provide the following information:
    • Identify any potentially hazardous or toxic materials that are expected be part of the proposed solution
    • Identify any biological materials (living, dead, or remnants, as described in the new Moon NASA Interim Directive found here: https://nodis3.gsfc.nasa.gov/OPD_docs/NID_8715_128_.pdf) that are expected be part of the proposed solution
    • Describe possible approaches to recycle, reuse, or repurpose materials, components, or systems at their end-of-life
  • Team Video Pitch: Teams must submit a short (90 second maximum) video to introduce the Team and pitch the proposed solution. In the video, Teams should address:
    • Introduce yourself and your organization and/or Team.
    • What is the Mission Activity or Activities that you are committed to solving?
    • What is your proposed solution?
    • What is unique about your proposed solution?
    • How would you measure success and achieve broad but meaningful impact?

Limits for Each Element of the Submission

Phase 1 Submission Element

Form Field Character Limit

Narrative  Page* and Size Limits

Limits for Additional Attachments     (such as data files, illustrations, etc.)

Concept Design Title

5 words/ 

30 characters

 

 

Technical Abstract

100 words/ 

600 characters

 

 

Technical Approach

 

Up to 5 pages 

in one (1) PDF 

no larger than 20 MB

Up to three (3) attachments each of which is no larger than 20 MB

Intellectual Property

50 words/ 

300 characters

 

 

Addresses the Mission Scenario and Mission Activities

 

Up to 5 pages 

in one (1) PDF 

no larger than 20 MB

Up to one (1) attachment no larger than 20MB

Development Plan

 

Up to 5 pages 

in one (1) PDF 

no larger than 20 MB

Up to one (1) attachment no larger than 20MB

Terrestrial Impact

500 words/

3,000 characters

 

 

Environmental Sustainability

500 words/ 

3,000 characters

 

 

Team Video Pitch

 

 

 

Teams will upload a link to a YouTube site

* For purposes of the Phase 1 Submission, a “Page” is defined as Letter size paper with 12- point font (Times New Roman) and 1-inch margins. 
 

Phase 1 Judging

Following the submission deadline, the Judging Panel will review the Phase 1 Submissions and meet (in-person or on video conference) to discuss, evaluate, and rank the Teams. The Judging Panel will evaluate Phase 1 Submissions on the following five (5) factors. Teams must score at least 50 points in order to be eligible for a prize purse.

Scientific/Technical Merit

Does the submission demonstrate a clear understanding of the problem and the current state-of-the-art? Is the concept design technically sound? Does it clearly and thoroughly provide and address the requested information needed to adequately evaluate the effort?

 

Addresses the Mission Scenario and Mission Activities

Does the submission present a compelling case that the concept design addresses the Mission Scenario and relevant Mission Activit(ies), including how the proposed solution would meet the operational power requirements; survive and perform in the unique environmental conditions of the lunar environment; and minimize system mass?

 

Feasibility of Proposed System

Does the submission present a compelling case that building and operating the proposed solution in Phase 2 is feasible? Does it communicate that the Team clearly understands the potential risks of building and demonstrating the proposed solution and how the risks would be addressed?

 

System Fabrication and Test Plans

Does the submission describe a clear pathway for the fabrication and testing of the proposed solution in Phase 2? Does it show that the Team has the necessary technical capabilities and experience, as well as access to the necessary instrumentation, facilities, and other resources required to successfully build and test the proposed system?

 

Bonus:

Relevance to Terrestrial Applications

Does the submission describe one or more credible terrestrial applications? Does the Team address what modifications (technical or other) might be necessary to deploy the system on Earth?

 

Scoring Table with Hypothetical Scores

Criteria

Improvement Needed

Meets Expectations

Exceeds Expectations

Exceptional

Perfect

Scientific/ Technical Merit

10

15

20

25

30

Addresses the Mission Scenario and Mission Activities 

10

15

20

25

30

Feasibility of Proposed System

10

15

20

25

30

System Fabrication and Test Plans

2.5

5

7.5

10

10

Bonus:

Relevance to Terrestrial Applications

0

5

5

10

10

TOTAL  SCORE

32.5

55

72.5

95

110

 

Following the announcement of scores, Teams may file an appeal through the Ombudsman. A Team Leader must submit any appeal in writing to the Ombudsman within one (1) day of the release of scores to the Team Leader and prior to prizes being awarded. All correspondence relating to an appeal will be conducted through the Ombudsman. An Ombudsman will act solely as the mediator between the Teams and the Judging Panel, if any appeals are raised. No Team Members will approach the Judging Panel with an appeal or attempt to sway the judges’ decision. The Ombudsman’s decision of the appeal will be rendered by the Ombudsman before the award of prizes and will be considered final. 

All Teams awarded a prize purse in Phase 1 will be encouraged to participate in Phase 2 (if Phase 2 is initiated). Phase 2 is expected to be open to any eligible Team, regardless of whether a Team participated Phase 1. 

 

Legal Requirements

In General

Teams are responsible for understanding and complying with all legal requirements as stated below and in the Team Agreement. The Team Agreement contains additional legal requirements and instructions.

Eligibility

NASA welcomes applications from individuals, teams, and organization or entities that have a recognized legal existence and structure under applicable law (State, Federal, or Country) and that are in good standing in the jurisdiction under which they are organized with the following restrictions:

  • Individuals must be U.S. citizens or permanent residents of the United States and must be 18 years of age or older.
  • Organizations must be an entity incorporated in and maintaining a primary place of business in the United States.
  • Teams must be comprised of otherwise eligible individuals or organizations and led by an otherwise eligible individual or organization.

U.S. government employees may enter the competition, or be members of prize-eligible teams, so long as they are not acting within the scope of their Federal employment, and they rely on no facilities, access, personnel, knowledge, or other resources that are available to them as a result of their employment, except for those resources available to all other participants on an equal basis.

U.S. government employees participating as individuals, or who submit applications on behalf of an otherwise eligible organization, will be responsible for ensuring that their participation in the Challenge is permitted by the rules and regulations relevant to their position and that they have obtained any authorization that may be required by virtue of their government position. Failure to do so may result in the disqualification of them individually or of the entity which they represent or in which they are involved.

Foreign citizens may only participate through an eligible U.S. entity as:

  • An employee of such entity;
  • A full-time student of such entity, if the entity is a university or other accredited institution of higher learning;
  • An owner of such entity, so long as foreign citizens own less than 50% of the interests in the entity; OR
  • A contractor under written contract to such entity.

Each individual, whether acting alone or as part of a Team, must identify their nationality. No Team Member shall be a citizen of a country on the NASA Export Control Program List Category II: Countries determined by Department of State to support terrorism. (The current list of designated countries can be found at http://oiir.hq.nasa.gov/nasaecp/). This includes individuals with dual citizenship unless they are a U.S. citizen or a lawful permanent U.S. resident (green card holder). Further, pursuant to Public Law 112-55, NASA is prohibited from participating, collaborating, or coordinating bilaterally in any way with China or any Chinese-owned company. Thus, NASA will review submissions to ensure no Team or entity falls under this prohibition. 

A Team-designated Team Leader shall be responsible for the actions of and compliance with the rules, including prize eligibility rules, by all members of their Team. 

Ineligible Persons or Entities

Teams will be ineligible to win a prize purse if any Team Member is a Federal entity or Federal employee acting within the scope of their employment. This includes any U.S. Government organization or organization principally or substantially funded by the Federal Government, including Federally Funded Research and Development Centers, Government-owned, contractor operated (GOCO) facilities, and University Affiliated Research Centers. No U.S. government funds may be used to participate in the Challenge. Any such entity or individual shall obtain prior written approval from their cognizant ethics officer that such participation does not violate federal personnel laws or applicable agency policy. A copy of this approval to participate in the Challenge shall promptly be provided to HeroX.

Current employees and consultants of HeroX may only participate as Team Members when the Team is not competing for a prize purse from NASA. Participation of such parties as Team Members on a Team will make a Team ineligible for any prize purse.

Use of Names, Trademarks, and Insignias

Team may not use the name, trademark or insignia of HeroX, its contractors, collaborators, or NASA on its printed materials related to the participation of Team in the Challenge without HeroX's or its contractor's, collaborator's, or NASA’s prior written consent, whichever Party is applicable.

Team agrees that unauthorized use of such names, trademarks, and insignias shall result in elimination from participation in the Challenge if Team continues unauthorized use after being notified to cease and desist by HeroX or NASA, as applicable.

Insurance and Indemnification

Each Team Member agrees to assume any and all risks and waives claims against HeroX and the U.S. Government and its related entities, except in the case of willful misconduct, for any injury, death, damage, or loss of property, revenue, or profits, whether direct, indirect, or consequential, arising from each Team Member’s participation in the Challenge, whether such injury, death, damage, or loss arises through negligence or otherwise. For the purposes of this section, the term “related entity” means a contractor or subcontractor at any tier, and a supplier, user, customer, cooperating party, grantee, investigator, or detailee.

Team agrees to obtain any and all insurance policies and coverage required by its local, state, or Federal governments to conduct any and all virtual activities related to or required by participation of Team and the Team Members in the Challenge. In addition, HeroX requires that each Team obtain liability insurance in the amount of $5,000 USD minimum that covers each Team Member or otherwise demonstrate financial responsibility for that amount. The Team’s liability insurance shall provide coverage for all claims by (A) a third party for death, bodily injury, or property damage, or loss resulting from an activity carried out in connection with participation in the Challenge, with the Federal Government and HeroX named as an additional insured under the Team’s insurance policies; and (B) the Federal Government, HeroX, and its contractors for damage or loss to Government or HeroX property resulting from or related to Challenge activities. The Team and all Team Members agree to indemnify the Federal Government and HeroX against third-party claims for damages arising from or related to Challenge activities.

Proof of insurance in such form as reasonably required by HeroX shall be provided to HeroX, no later than ten (10) days prior to the Submission Deadline as outlined in Exhibit C of the Team Agreement. Alternatively, if Team intends to fulfill this requirement by demonstrating financial responsibility in the requisite amount, Team shall submit to HeroX in writing such information as demonstrates to HeroX, in HeroX’s reasonable discretion, that Team has sufficient financial responsibility to cover the potential claims cited in the requisite minimum amount as outlined in Exhibit C of the Team Agreement.

Delay, Cancellation or Termination

Team acknowledges that circumstances may arise that require the Challenge to be delayed indefinitely or cancelled. Such delay or cancellation, and/or the termination of the Challenge, shall be within the full discretion of NASA, and Team accepts any risk of damage or loss due to such delay, cancellation, and/or termination.

Winners
Timeline
Updates29

Challenge Updates

Last Chance! Provide feedback on the Phase 2 Rules

Sept. 8, 2021, 9:49 a.m. PDT by Kyla Jeffrey

The deadline for feedback on the draft Phase 2 rules is Friday, September 10, 2021, at 5:00 pm CDT. This is your opportunity to provide input in the design and structure of Phase 2.

You can view the draft rules and provide your feedback by responding to the RFI here -->


Provide your feedback on Phase 2 Rules for Watts on the Moon!

Aug. 31, 2021, 8:12 a.m. PDT by Kyla Jeffrey

NASA is seeking feedback on the Phase 2 rules for the Watts on the Moon Challenge. 

This is your opportunity to have an early preview of the rules and provide your feedback!

You can view the draft rules and provide your feedback here -->

The deadline for feedback is September 10, 2021, at 5:00 pm CDT.

 


Phase 2 Status

Aug. 4, 2021, 1:20 p.m. PDT by Liz Treadwell

 

Here's an update regarding the Phase 2 status of the Watts on the Moon Challenge!

 


Did you miss the Webinar? Check it out here!

June 17, 2021, 2 p.m. PDT by Shane Jenkins

Dear Innovators,

If you happened to miss the Watts on the Moon Winners Webinar earlier this week - you can now view the recording below. Enjoy!

 


Only 24 hours left! Save your seat today!

June 15, 2021, noon PDT by Shane Jenkins

This is your last reminder to register for the next Watts on the Moon Webinar! Sign up at the link below to get your invitation to the event where you can meet the winners!

Join us on Tuesday, June 15th, 3 pm ET/12 pm PT as HeroX and the NASA team sit down with the Phase 1 winners to hear a little from each team and to ask them questions about their proposals. You won't want to miss this!

 

Reserve your seat here.


Forum91
Teams3.3K
Q. It's Q. It's
1 team member
Looking for members
Joseph Blackard's team Joseph Blackard's team
1 team member
Looking for members
Maria Terranova-Anderson's team Maria Terranova-Anderson's team
1 team member
Looking for members
Bright Future Bright Future
1 team member
Looking for members
Abdallah Salem's team Abdallah Salem's team
1 team member
Looking for members
KC's team KC's team
1 team member
Looking for members
ARCS CSUN ARCS CSUN
2 team members
Looking for members
AdvTech AdvTech
1 team member
Looking for members
Hephaestus Engineering Hephaestus Engineering
3 team members
Looking for members
Life in the Universe (LTU) Life in the Universe (LTU)
1 team member
Looking for members
Changzheng Huang's team Changzheng Huang's team
2 team members
Looking for members
Albert Miller's team Albert Miller's team
1 team member
Looking for members
Think Outside The Earth Think Outside The Earth
1 team member
Looking for members
Dan Hawk's team Dan Hawk's team
1 team member
Looking for members
Johnny's team Johnny's team
1 team member
Looking for members
Thomas Marsden's team Thomas Marsden's team
1 team member
Looking for members
Astrolight Astrolight
4 team members
Looking for members
SDSL SDSL
3 team members
Looking for members
Advanced Lunar Solar Plus Storage Advanced Lunar Solar Plus Storage
2 team members
Looking for members
Embid Embid
1 team member
Looking for members
Thunder Mountain Express Thunder Mountain Express
1 team member
Looking for members
Vince Wong's team Vince Wong's team
2 team members
Looking for members
Steampunk Space Systems Steampunk Space Systems
1 team member
Looking for members
Gravitic Engine Network Team Gravitic Engine Network Team
1 team member
Looking for members
Team Lunar FuelPod Team Lunar FuelPod
5 team members
Looking for members
Astrobotic Technology, Inc. Astrobotic Technology, Inc.
1 team member
Looking for members
Stephenie Tesoro's team Stephenie Tesoro's team
1 team member
Looking for members
The Jeffs The Jeffs
1 team member
Looking for members
Electrons of moon Electrons of moon
3 team members
Looking for members
Chathumika Devmin's team Chathumika Devmin's team
1 team member
Looking for members
Zorya Zorya
2 team members
Looking for members
Team Skyline X Team Skyline X
3 team members
Looking for members
Aryabrath Aryabrath
2 team members
Looking for members
Lunatherm Lunatherm
3 team members
Looking for members
Suryansh Saxena's team Suryansh Saxena's team
2 team members
Looking for members
Océane Canlers's team Océane Canlers's team
1 team member
Looking for members
Resources
FAQ
Registration